Project Description

About Acadian – Haynesville Extension Project

The Acadian – Haynesville Gas Pipeline Construction Project with 42” and 36” pipeline is an extension of the Enterprise Pipeline’s existing “Acadian” system. The new pipeline system consists of approximately 256 miles of pipe. The system begins in Red River Parish, LA, runs through DeSoto, Natchitoches, Rapides, Avoyelles, St. Landry, Pointe Coupee, Iberville and Assumption Parishes terminating approximately 10 miles southwest of the town of Donaldsonville, LA.

The project is broken into 3 major Segments with a proposed total of 5 Spreads. Segment 1 encompasses Spread 1 and Spread 2, Segment 2 encompasses Spread 3 and Spread 4, and Segment 3 encompasses Spread 5. The respective approximate lengths of the spreads are as follows: Spread 1 ~ 41.15 miles of 42” and 2.5 miles of 36” and 2.5 miles of 20”, Spread 2 (42”) ~ 64.82 miles; Spread 3 (42”) ~ 36.2 miles, Spread 4 (36”) ~ 60.2 miles and Spread 5 (36”) 48.44 miles.